Energy Reduction in Industrial LPG Thermal Curing
AirIonix was installed and tested in an industrial gas-cylinder maintenance and coating facility, where it was integrated with an LPG-fired burner used for a thermal curing oven. The system was deployed as a retrofit without any modification to the existing burner or heating infrastructure. The field test was conducted over approximately four months, from January to February 2025, under normal operating conditions with an LPG supply pressure of 115 mBar. System performance an
AirIonix Co., Ltd.
Feb 181 min read
Â
Â
Â


Combustion Optimization in Industrial Can-Manufacturing Oven
AirIonix was installed and tested in an industrial aluminum sheet processing facility, where it was integrated with an LPG-fired burner used for a thermal curing oven in the can-manufacturing process. The system was deployed as a retrofit without any modification to the existing burner or heating infrastructure. The field test was conducted over approximately six months, from February to August 2025, under normal production conditions with an LPG supply pressure of 120 mBar.
AirIonix Co., Ltd.
Feb 181 min read
Â
Â
Â


Field-Tested Combustion Enhancement in Industrial Oven
AirIonix was installed and tested in an industrial gas-cylinder maintenance and coating facility, integrated with an existing LPG-fired burner used in a thermal curing oven. The system was deployed as a retrofit, without any modification to the original burner or heating equipment. The field test was conducted over approximately four months, from October 2024 to February 2025, under normal operating conditions. Fuel consumption and system performance were monitored throughout
AirIonix Co., Ltd.
Jan 131 min read